| 

intra-mart Accel Collaboration 2014 Winter / Release Note Initial Version 2014-12-01

Table Of Contents ≪  9.2.2. Schedule (Smart Phones) 9.3.1. CalDAV(Common)  ≫

Table Of Contents

  • 1. Revision Information
  • 2. Introduction
  • 3. Changes from intra-mart Accel Collaboration 2014 Summer
  • 4. Function List
  • 5. System Requirements
  • 6. Validated Environment
  • 7. Third-party License List
  • 8. Limitations
  • 9. Known Issues
  • 10. Warranty Regulations
  • 11. Copyright and Special Remarks

9.3. CalDAVΒΆ

  • 9.3.1. CalDAV(Common)
    • 9.3.1.1. When schedule is displayed by CalDAV client, update can be performed even if CalDAV operation user was excluded from participants by other users.
    • 9.3.1.2. When the schedule is updated by CalDAV client, following invalid behavior would result if the schedule type is switched between regular/normal.

Table Of Contents

  • 1. Revision Information
  • 2. Introduction
  • 3. Changes from intra-mart Accel Collaboration 2014 Summer
  • 4. Function List
  • 5. System Requirements
  • 6. Validated Environment
  • 7. Third-party License List
  • 8. Limitations
  • 9. Known Issues
  • 10. Warranty Regulations
  • 11. Copyright and Special Remarks

Table Of Contents ≪  9.2.2. Schedule (Smart Phones) 9.3.1. CalDAV(Common)  ≫


Copyright © 2014 NTT DATA INTRAMART CORPORATION

⇄ Sidebar ↑Top