3. Changes from intra-mart Accel Collaboration 2014 Summer¶
3.1. Summary of Additional Functions¶
- Common
Added items that can be used in rich text.Added setting to fix sending mail address of notification mail uniformly.Even if the user who sets invalid mail address to the destination address is included, it was made to send mail to all users who are specified without terminating the operation prematurely.
- Information
Added a function that can copy URL to display specific information.
- Schedule
Added a function to filter by posts in user search of schedule.Added a schedule linkage function using CalDAV.Added a function that can copy URL to display specific schedule.Added a function that can shift the display of schedule (week) by day.Added a function that can set colors for each schedule.Uniformed operations of See More.Improved the input operation of schedule search portlet by automatically expanding the input width.
- File library
Added a function that can copy URL to download a specific file in the file library.
- Smart Phones
Added icons on menu of Smart Phones version intra-mart Accel Collaboration.
3.2. System Requirements¶
- Server Requirements
- Added Red Hat Enterprise Linux 7.
- Added JDK 8 as operation environment.
- Client Requirements
- Changed Google Chrome 35 → 39.
- Changed Safari 7 → 7.1.
- Changed iPhone device iOS 7.0.4 or above → iOS 8.1 or above.
- Changed iPad device iOS 7.0.4 or above → iOS 8.1 above.
3.3. Validated Environment¶
- Server Environment
- Added Red Hat Enterprise Linux 7.
- Added JDK 8 as operation environment.
- Client Environment
- Changed Google Chrome 35 → 39.
- Changed Safari 7 → 7.1.
- Changed validation device iPhone 5s → iPhone 6 , iPhone 6 Plus.
- Changed validation device iPad(3G) → iPad Air.
- Changed verification OS of Smart Phones iOS 7.0.4 → iOS 8.1.
3.4. Third-party Library¶
- Additions/Changes
- Added ZeroClipboard 1.3.5.
- Eliminations
- There is no third-party library that has been eliminated.
3.5. Limitations / Known Issues¶
[Added Limitations / Known Issues]
- Schedule (PC)
- Information (PC)
- Workspace (PC)
- CalDav(common)
- There are limitations on the request in CalDAV communication.
- User password is required to perform CalDAV linkage.
- Participants cannot be selected when the schedule is registered.
- Facility reservation cannot be made when schedule is registered.
- Schedule of time zone that is not supported in intra-mart Accel Collaboration cannot be registered.
- Client reminder (alarm) setting is not supported.
- Participants and facilities cannot be accessed at schedule reference time.
- Participants and facilities cannot be changed at schedule update time.
- When the schedule synchronization is to be made, E tags of all schedule data for the target term should always be obtained.
- If start/end date and time of the schedule is out of CalDAV obtaining subject period,it will not be displayed even if it is right after the registration and update.
- Iteration conditions for schedule registration and update are limited only to the ones that can be specified by the schedule function of intra-mart Accel Collaboration.
- Iteration interval that can be specified when registering or updating weekly schedule for each iteration type is [1] only.
- Schedule with more than [2] iteration interval for each week is not displayed correctly on CalDAV client.
- In case [No iteration limit] is specified when iteration schedule is registered or updated, schedule and event of maximum term in the setting file are registered.
- Only daily, weekly, or monthly can be specified to iteration type at iteration schedule registration or update time.
- Interval cannot be specified when registering or updating daily schedule for each iteration type.
- Number of times of iterations cannot be specified for iteration schedule registration or update.
- Only one date can be specified for the monthly iteration when registering and updating monthly schedule for each iteration type.
- Data which is outside the obtaining period of CalDAV schedule setting file will also be displayed.
- Regular schedule that you declined in the schedule of intra-mart Accel Collaboration will be displayed on CalDAV client.
- Schedule registration by inputting number of characters that exceed maximum number limit in the description field of intra-mart Accel Collaboration can be made.
- When schedule is displayed by CalDAV client, update can be performed even if CalDAV operation user was excluded from participants by other users.
- When the schedule is updated by CalDAV client, following invalid behavior would result if the schedule type is switched between regular/normal.
- CalDAV(Thunderbird Lightning)
- Only one CalDAV account may be registered for one server in Thunderbird Lightning.
- For the schedule of time zone that is not supported in Thunderbird Lightning, warning would be displayed at reference time.
- In case iteration schedule is registered in Thunderbird Lightning, end date may not match with the date you have specified.
- In case daily schedule for each iteration type is registered in Thunderbird Lightning, weekdays cannot be specified.
- If you change only the start date without changing the end date of regular schedule, end date will also be changed.
- CalDAV(iPhone)
- Synchronization setting on iPhone device is invalid.
- Display name and color of calendar are fixed throughout the system.
- The color edited on the device will revert to the system setting by deleting the account and re-registering it.
- Calendar name that was edited on iPhone device will be reverted to the system setting by synchronization.
- On iPhone device, schedule cannot be registered by specifying the last date of each month as the iteration condition.
- If you failed to register the schedule on iPhone device, the failed schedule will remain displayed on the screen.
[Updated Limitations / Known Issues]
- There is no updated limitations or known issues.
[Deleted Limitations / Known Issues]
- Schedule (PC)
- Common (Smart Phones)