IM-BIS route¶
In IM-BIS, define the process that joins task and branch etc. in “Route definition” by line.Set process target user for each task and define “Who” can process “Which operation”.Set process (Screen) in each task and branch condition for IM-BIS based on route definition and control task execution authorization and branch conditions in the process execution.
Contents
Types of node that can be used in BPM route¶
Types of node that can be used in workflow route¶
Setting method for each node¶
Place any icon on the route definition edit grid and perform individual settings after linking by dragging between the icons.When the settings of all the icons is performed, click “Update” and save.
Application/Approval¶
- The settings screen is displayed on the right when the target icon is clicked.
- Click “Search” of the process target user.
- Select the type of target user.
- Add the target user in the search screen matching with the selected type.
Synchronous start/Synchronous end¶
- Place the synchronous target process icon between the synchronous start icon and end icon and link it.
Branch start/Branch end¶
- Place the branch target process icon between branch start icon and end icon and link it.
Comment¶
- After placing on the grid, draw aline by dragging from “
” icon at top right to the target node.
- The settings screen is displayed on the right when the target icon is clicked.
- Enter the contents to be displayed as comment in the comment name.
- The contents entered in comment on the grid are reflected when the locations other than settings screen are clicked.
Swimlane¶
- After placing on grid, adjust the size by dragging any of the four corners.
- The settings screen is displayed on the right when “Swimlane” on the grid is clicked.
- Enter the name to be set in “Swimlane name” of settings screen.
- The contents entered in comment on the grid are reflected when the locations other than settings screen are clicked.
Nodes that require special settings¶
In case of using the following nodes, detail settings are required by the IM-BIS system administrator.Refer “IM-Workflow Administrator Guide” for the details.
- Check
- Dynamic approval
- System
- Horizontal alignment
- Vertical alignment