intra-mart Accel Collaboration 2014 Summer / Release Note

Initial Version 2014-08-01

«  8.2.2. Schedule(PC)   ::   Contents   ::   8.2.4. Message Memo(PC)  »

8.2.3. ToDo(PC)

8.2.3.1. About ToDo which was created by linkage wuth Check List item of Workspace Function

Even if the ToDo is removed as a member of applicable workspace, the ToDo will remain in the ToDo Completion List/Incompletion list.

«  8.2.2. Schedule(PC)   ::   Contents   ::   8.2.4. Message Memo(PC)  »